Pinner / Project 12

A main bathroom and ensuite in Pinner

Two finished bathrooms in one Pinner home, with distinct layouts and coordinated details.

BathroomsCompleted 2025
Fluted wood-effect cabinetry, vanity, wall-hung WC and shower
Fluted wood-effect cabinetry, vanity, wall-hung WC and shower

01 / overview

The project

The main bathroom combines a separate bath and shower, fluted wood-effect cabinetry and speckled finishes. The ensuite uses a dark blue vanity with a glass shower enclosure. The work followed an earlier cloakroom commission in the same home; the photographs here show the main bathroom and ensuite.

The gallery and films identify the documented stages. Separate viewpoints show different moments in the work.

02 / films

Watch the work unfold

Explore the recorded room views and construction stages. Where photographs and footage are combined, the sequence presents separate documented moments rather than continuous time.

Main bathroom · room and detailsBath, floating vanity, wall-hung WC, shower and tiled finishes in the completed main bathroom.Recorded footage · 14 sec · Silent
Explore 1 more sequence in this chapter
Ensuite · compact room and detailsBlue vanity, WC and glazed shower in the completed ensuite.Recorded footage · 11 sec · Silent